TR Trans Rail AG has successfully introduced RailOpt
On 7 January 2020 we started with the first RailOpt training. Within a short time, our six-member team was introduced to the new RailOpt scheduling program, which has been replacing our old scheduling program (Disporail) step by step since 1 January 2020. Qnamic’s new solution makes our daily work easier and guarantees compliance with current regulations (BAV/AZG).
In order to be able to work with the new system on the rails as well, we started with the introduction of RailOpt WEB on 1 April 2020. This web application is the interface between personnel and planning and facilitates communication between production and engineers. Route knowledge, working time accounts, qualifications and all documents relevant to external operations are managed and controlled via the platform.
Since April 2020, the first test runs have been carried out with the DIS information system, which is integrated into the RailOpt WEB application. (program analogous to LEA SBB). All train drivers will be informed as soon as it is ready for operation and the platform contains all relevant information for the outside operation. In other words: You are up to date at a glance!
The training was a complete success thanks to the professional introduction by Qnamic. During the 10 days of training we were able to create a good basis, which can be expanded in the future via telephone support. We are looking forward to further cooperation with Qnamic.
Monika Linder, Dispatch/Production | TR Trans Rail AG